The U.S. Department of Energy (DOE) is a federal executive department. It does not make solar cells. In perovskite solar cells, its main role has been to fund R&D at universities, national laboratories and start-ups, and to push commercialisation along through a validation centre and prize competitions. The tandem development work at First Solar, Swift Solar and Tandem PV was also selected through DOE funding calls. This profile looks at one question only: how much influence DOE actually has over perovskite solar cells.

Sources: DOE's FY 2025 Agency Financial Report, the FY 2027 Budget in Brief, DOE's official pages on its perovskite-related programmes, funding programmes and prize competitions, and a funding opportunity webinar deck. Last updated September 2026.

What this article covers
  1. DOE in 30 seconds
  2. What kind of body it is: the four types of influence
  3. What it does for perovskite solar cells
  4. How far its influence reaches (powers and geography)
  5. The companies and organisations involved
  6. Outlook
  7. Glossary, references and claim-to-source audit

1. DOE in 30 seconds

FULL NAMEUnited States
Department of Energy
Abbreviated DOE
COUNTRYUnited StatesA federal agency. Perovskite work sits with IESO, within CMEI
TYPE OF BODYFederal executive departmentMost of its national laboratories are run by contractors
ESTABLISHED1977Created by the Department of Energy Organization Act
STAFF15,705 federal employeesDown by more than 3,500 during 2025. More than 100,000 contractors
BUDGET (DISCRETIONARY)US$53.91 billion (FY2027 request)US$4.81 billion more than the FY2026 enacted level
ROLE IN PEROVSKITE SOLAR CELLSR&D funding, a validation centre and prizesDOE runs the calls, selection and awards itself
REACHResearch institutions and companies in the U.S.The FY2027 request gives the responsible office, IESO, a budget of zero
The one thing to grasp first

DOE is both a funder and a policymaker that sets the direction of national R&D. For perovskite solar cells it has named four challenges (efficiency, durability, manufacturability and bankability, meaning reliability good enough for lenders to finance projects) and directed money at each of them Sourced. Since 2025, however, the department has been reorganised, and solar R&D is now handled by the Integrated Energy Systems Office (IESO) within the Office of Critical Minerals and Energy Innovation (CMEI). On top of that, the FY2027 budget request gives IESO a budget of zero.

2. What kind of body it is: the four types of influence

Unlike the companies in this series, none of the institutions that appear in perovskite solar cell coverage makes solar cells. What separates them is the route by which they influence the industry, and that gives four types.

Four types of institution that shape perovskite solar cells Institutions do not make solar cells. They differ in the route by which they influence the industry Funding Policy & regulation Standards Convening Allocates R&D budgets Targets, subsidies, tax Test methods, efficiency Trade shows, associations NEDO / DOE METI / DOE IEC / NREL Intersolar Europe What gets researched What gets built at home Measuring and comparing Who meets whom Reach: own budget Reach: own territory Reach: member countries Reach: participants DOE spans funding and policy: it sets research priorities and runs calls, selection and awards itself Congress has the final say on budgets. International standards belong to the IEC, outside DOE's powers
Fig. 1 Four types of institution involved in perovskite solar cells, and where DOE sits. The classification is our own, and the examples are drawn from the institutions covered in this series Our calculation. DOE is highlighted under two types because it does not just hand out research money but also sets R&D priorities itself. NREL in the figure is now called the National Laboratory of the Rockies (NLR).

3. What it does for perovskite solar cells

DOE's money for perovskite solar cells has come through three channels: R&D funding calls, a validation centre and prize competitions Sourced. All amounts are as announced at selection, and DOE notes that they may change during negotiations.

ProgrammeWhenAmountWhat it covers and who was selected
Solar Energy Technologies Office Fiscal Year 2020 Perovskite Funding ProgramAnnounced August 2020
Selected March 2021
22 projects, US$40 millionThree topic areas: device efficiency and stability, module manufacturing, and validation and bankability. Open to universities, national laboratories and companies
Validation centre PACTSelected March 2021US$9 million + US$5 millionSandia National Laboratories (PACT, US$9 million) and NREL (CHEETA, US$5 million) operate as a single centre. It develops accelerated test protocols, validates performance outdoors and gives investors objective information
American-Made Challenges: Perovskite Startup PrizeMarch 2021 to July 2024US$3 million in totalA prize competition for newly founded U.S. for-profit companies. In January 2024 DOE announced the single winner of the final stage (Verde Technologies)
Advancing U.S. Thin-Film Solar Photovoltaics (perovskite tandem part)Call issued September 2023
Selected May 2024
US$44 million overall
of which four projects, US$23.7 million
Cubic PV, First Solar, Swift Solar and Tandem PV. The goal is, by the end of 2026, 27% conversion efficiency on modules larger than 500 cm², and passing selected IEC 61215 tests among other targets
A materials engineer's view: DOE has paid for durability and validation

DOE says that to compete with commercial technologies, perovskite PV must survive at least 20 years outdoors, and it puts degradation by water and oxygen at the top of the list of problems Sourced. Projects selected under the FY2020 programme include barrier films that seal in lead, and encapsulation and moisture-barrier work aimed at modules that still deliver 80% of their original output after 20 years. The 2024 tandem call likewise set passing selected IEC 61215 tests as a condition, not just efficiency. For a supplier of encapsulants, barrier films or hole-transport materials, U.S. public money has been aimed less at "efficiency records" than at "proof that the product lasts".

4. How far its influence reaches (powers and geography)

AspectWhat DOE hasWhat it does not have
PowersThe power to set R&D challenges and performance targets and to run calls, selection and awards itself. It runs prize competitions and has national laboratories set up validation centresThe final say on the budget (Congress passes it). Power to decide international standards (IEC)
GeographyProgrammes funded from the U.S. budget that support U.S. universities, national laboratories and companies. The 2024 tandem call aimed at market acceptance of tandems made in the United StatesAny direct authority over foreign companies or other countries' markets
Wider reachPACT's stated role is to create fair test protocols and give objective information to investors and lendersPower to make other countries or other companies follow those test protocols
Scale15,705 federal employees (early 2025), down by more than 3,500, plus more than 100,000 contractors. IESO's FY2026 enacted budget is US$320 million (including work other than solar)The Budget in Brief does not show an annual amount spent on perovskite solar cells alone
A note on reading the numbers

The "zero budget for IESO" in FY2027 is a budget request from the administration to Congress, not an enacted amount. In the Budget in Brief tables, IESO has US$181.71 million enacted for FY2025, US$320 million enacted for FY2026 and a request of zero for FY2027 (down 100% year on year) Sourced. The amounts in section 3 are also figures at the time of selection, and may since have changed through negotiation and contracting, or through the reviews carried out from 2025. We have not been able to confirm whether each individual project is still running Not yet confirmed.

5. The companies and organisations involved

How DOE money for perovskite solar cells has flowed (U.S.) Formerly run by SETO (Solar Energy Technologies Office); IESO within CMEI now hosts its pages DOE (CMEI / IESO) Sets priorities; calls, selection, awards U.S. Congress Passes the budget FY2020 programme Selected March 2021 Universities, labs, companies: 22 projects Efficiency and stability Module manufacturing US$40 million PACT validation centre Selected March 2021 Sandia National Labs NREL (now NLR) Accelerated test methods Outdoor validation US$9M + US$5M Startup Prize March 2021 - July 2024 For new U.S. companies Winner: Verde Technologies US$3M in total Tandem funding call Selected May 2024 Swift Solar US$7M First Solar US$6M Cubic PV US$6M Tandem PV US$4.7M 27% efficiency by end-2026 Total US$23.7M
Fig. 2 How DOE money for perovskite solar cells has flowed. Amounts are DOE's share at selection, in U.S. dollars. Sources: DOE's official pages for each programme and prize competition. The total for the four tandem projects is our own sum Our calculation.

Links to the company profiles in this series

CompanyLink to DOE programmes (as stated in primary sources)Link to this series
First Solar"High-Performance Tandem Modules Based on Wide-bandgap FAPbI3 Perovskites and Narrow-bandgap CI(G)S Bottom Cells" (US$6 million, targeting 27% conversion efficiency)Company profile in preparation
Swift Solar"PIPPIN: Perovskite-Silicon Tandem Solar Cells from Prototype to Production", a perovskite-silicon tandem with the perovskite layer made by vapour deposition (US$7 million)Company profile in preparation
Tandem PV"STACKED: Stability and Characterization of Hole-Transporting Layers Key to Enabling Outdoor Durability" (US$4.7 million)Company profile in preparation
Cubic PV, Verde TechnologiesCubic PV: a four-terminal perovskite-silicon tandem (US$6 million). Verde Technologies: winner of the Startup PrizeNot covered in this series

6. Outlook

What the evidence suggestsPrimary information it rests onCategory
If the FY2027 request is enacted as proposed, new DOE funding calls for terrestrial solar, perovskites included, will become less likelyThe Budget in Brief sets IESO's FY2027 request at zero, and says CMEI will prioritise critical minerals, hydropower and advanced manufacturingInference
For the four tandem projects selected in 2024, the end of 2026 will be the point at which results are measuredThe funding opportunity webinar set targets to be met by the end of 2026, including 27% conversion efficiency, modules larger than 500 cm² and passing selected IEC 61215 testsInference
DOE's influence will persist less through new money than through an accumulated body of "how to measure", such as PACT's test protocols and national laboratory dataPACT's stated role is to develop accelerated test protocols and provide objective information to investorsInference

7. Glossary

CMEI
The Office of Critical Minerals and Energy Innovation, the DOE office that took over the work of the former Office of Energy Efficiency and Renewable Energy (EERE).
IESO
The Integrated Energy Systems Office, the unit within CMEI responsible for R&D on solar, wind, the power grid and related areas.
Bankability
Having enough evidence on performance and lifetime for financial institutions to decide to lend to a project.
PACT
The Perovskite PV Accelerator for Commercial Technologies, a centre that independently validates the performance and lifetime of perovskite solar cells.
IEC 61215
The international standard for design qualification and type approval of terrestrial photovoltaic modules. It sets out tests such as temperature and humidity exposure.

8. References

  1. U.S. Department of Energy FY 2025 Agency Financial Report: the Department of Energy Organization Act of 1977, roughly 15,000 federal employees and more than 100,000 contractors, and a reduction of more than 3,500 from 15,705 in 2025. https://www.energy.gov/sites/default/files/2025-12/fy-2025-doe-agency-financial-report.pdf
  2. U.S. Department of Energy FY 2027 Budget in Brief (April 2026): US$53.91 billion in discretionary funding, the budget of CMEI (formerly EERE), FY2025 and FY2026 enacted amounts and the FY2027 request for Integrated Energy Systems, and the National Laboratory of the Rockies. https://www.energy.gov/documents/doe-fy-2027-budget-brief
  3. U.S. Department of Energy Integrated Energy Systems Office: IESO's role, and its place under the Office of the Assistant Secretary for CMEI. https://www.energy.gov/cmei/systems/integrated-energy-systems-office
  4. U.S. Department of Energy Perovskite Solar Cells: IESO's support for R&D, the four challenges, and NLR's efficiency chart. https://www.energy.gov/cmei/systems/perovskite-solar-cells
  5. U.S. Department of Energy Four Ways DOE is Helping Clear the Path to Commercialization of Perovskite Solar Cells: durability, efficiency at scale, manufacturability and bankability, and at least 20 years outdoors. https://www.energy.gov/cmei/articles/four-ways-doe-helping-clear-path-commercialization-perovskite-solar-cells
  6. U.S. Department of Energy Solar Energy Technologies Office Fiscal Year 2020 Perovskite Funding Program: announcement in August 2020, selection of 22 projects worth US$40 million in March 2021, the three topic areas and project summaries. https://www.energy.gov/cmei/systems/solar-energy-technologies-office-fiscal-year-2020-perovskite-funding-program-0
  7. U.S. Department of Energy FY2020 Perovskite Funding Program Validation and Bankability Center: PACT and CHEETA, US$9 million to Sandia and US$5 million to NREL, and the centre's role. https://www.energy.gov/cmei/systems/solar-energy-technologies-office-fiscal-year-2020-perovskite-funding-program
  8. U.S. Department of Energy American-Made Challenges: Perovskite Startup Prize: US$3 million in total, March 2021 to July 2024, and Verde Technologies named winner on 30 January 2024. https://www.energy.gov/cmei/systems/american-made-challenges-perovskite-startup-prize
  9. U.S. Department of Energy Advancing U.S. Thin-Film Solar Photovoltaics Funding Program: US$44 million, call in September 2023 and selection in May 2024, and the four perovskite tandem awardees and their amounts. https://www.energy.gov/cmei/systems/advancing-us-thin-film-solar-photovoltaics-funding-program
  10. U.S. Department of Energy SETO Thin-Film PV FOA 3058 webinar slides (September 2023): performance targets for the end of 2026 (27% conversion efficiency, more than 500 cm², selected IEC 61215 tests) and the goal of market acceptance for tandems manufactured in the United States. https://www.energy.gov/sites/default/files/2023-09/SETO%20Thin-Film%20PV%20FOA%203058%20-%20Webinar.pdf

9. Claim-to-source audit

Claim in the articleCategorySource
Established in 1977, a reduction of more than 3,500 from 15,705 federal employees, more than 100,000 contractorsSourcedReference 1 https://www.energy.gov/sites/default/files/2025-12/fy-2025-doe-agency-financial-report.pdf
FY2027 request of US$53.91 billion, US$4.81 billion more than FY2026, CMEI as the former EERE, IESO's FY2025 and FY2026 enacted amounts and zero FY2027 request, CMEI's priorities, NREL's current name NLRSourcedReference 2 https://www.energy.gov/documents/doe-fy-2027-budget-brief
IESO's role and its place within CMEISourcedReference 3 https://www.energy.gov/cmei/systems/integrated-energy-systems-office
IESO supports perovskite R&D, the four challenges, and the former SETO page now published as an IESO pageSourcedReference 4 https://www.energy.gov/cmei/systems/perovskite-solar-cells
At least 20 years outdoors, degradation by water and oxygen, bankabilitySourcedReference 5 https://www.energy.gov/cmei/articles/four-ways-doe-helping-clear-path-commercialization-perovskite-solar-cells
22 projects and US$40 million under the FY2020 programme, the three topic areas, and projects on barrier films that seal in lead and on 80% output after 20 yearsSourcedReference 6 https://www.energy.gov/cmei/systems/solar-energy-technologies-office-fiscal-year-2020-perovskite-funding-program-0
Amounts, host laboratories and roles of PACT and CHEETASourcedReference 7 https://www.energy.gov/cmei/systems/solar-energy-technologies-office-fiscal-year-2020-perovskite-funding-program
The Startup Prize's total, period, eligibility and winnerSourcedReference 8 https://www.energy.gov/cmei/systems/american-made-challenges-perovskite-startup-prize
The thin-film PV programme's US$44 million and timing, and the four perovskite tandem awardees, their projects and amountsSourcedReference 9 https://www.energy.gov/cmei/systems/advancing-us-thin-film-solar-photovoltaics-funding-program
Performance targets for the end of 2026, selected IEC 61215 tests, and the goal of tandems manufactured in the United StatesSourcedReference 10 https://www.energy.gov/sites/default/files/2023-09/SETO%20Thin-Film%20PV%20FOA%203058%20-%20Webinar.pdf
The four types of institutionOur calculationOur own classification
Total of US$23.7 million for the four tandem projectsOur calculationOur own sum of the four amounts in reference 9
The annual budget for perovskites alone, and whether individual projects are still runningNot yet confirmedNot stated in references 2 or 6 to 9; this article does not estimate them
The three points in the outlook (section 6)InferenceThis article's reading of references 2, 7 and 10

Last updated 25 September 2026 / Troy Technical
All figures come from DOE's financial report, Budget in Brief, official web pages and funding opportunity materials. Amounts are those at the time of selection. Items marked "Inference" are this article's reading of the primary information, not statements by DOE.

🌐 Japanese