COMPANY PROFILE / NEXT-GEN ENERGY STORAGE

Sumitomo Electric Industries
After some 40 years on the redox flow battery, a company launching a "30-year" model and widening its storage-site orders

Sumitomo Electric appears in next-generation energy storage because it handles the redox flow battery (RFB), which holds vanadium electrolyte in tanks and circulates it by pump, from the battery itself through to installing and operating the storage site. In April 2022, a grid-side battery of 17,000 kW and 51,000 kWh began operation at Hokkaido Electric Power Network's Minami-Hayakita Substation. In September 2025 it unveiled the new V40 series, which it says can run for up to 30 years and offers about 30% more output; in 2026 three projects were selected for a METI subsidy for grid-scale batteries, and Hokkaido Electric Power Network chose it for a third time. Yet the company's own magazine records that, after development began in the 1980s, management decided in 2005 to withdraw, and revived the business in 2009, and the company itself says its greatest challenge is price. This profile covers the redox flow battery only, not Sumitomo Electric as a whole, and sets out from primary sources what the company has committed, with whom it works and how much it discloses.

Sources: Sumitomo Electric Industries' 156th Securities Report (April 2025 to March 2026, filed 26 June 2026), Integrated Report 2026, the official RFB pages and catalogue (September 2026 edition), official press releases (January 2025 to September 2026) and the company magazine "id" Vol. 19, used as primary material. Last updated October 2026.

What this article covers
  1. Sumitomo Electric in 30 seconds, and where it stands in next-generation energy storage
  2. The logo and how the name is written
  3. Where the company sits in the field
  4. Scale (kept brief, limited to the redox flow battery)
  5. Resources committed to next-generation energy storage
  6. What it has done so far
  7. What comes next
  8. What the company is aiming for in energy storage
  9. Map of partnerships in next-generation energy storage
  10. Technologies, products and services
  11. The risks this company carries
  12. Glossary, references and claim-to-source audit

1. Sumitomo Electric in 30 seconds, and where it stands in next-generation energy storage

LEGAL NAMESumitomo Electric Industries, Ltd.Founded 1897, incorporated 1920
HEAD OFFICEOsaka, JapanSumitomo Building, Kitahama 4-5-33, Chuo-ku
LISTINGTokyo, Nagoya, Fukuoka
securities code 5802
From the Integrated Report 2026. Tokyo Prime Market
TYPE IN THIS FIELDLong-duration & new (primary)
Storage systems (secondary)
From the battery to installing and operating the storage site
CORE PRODUCTRedox flow battery
new "V40 series"
2 MW systems with 4, 6 and 8 hours of capacity
LARGEST OPERATING RECORD17,000 kW
51,000 kWh
Hokkaido Electric Power Network. Operation began in April 2022
RECENT ORDERS3 subsidy projects (26 MWh),
a third in Hokkaido
Announced February to April 2026. All to be built
BATTERY-ONLY RESULTSNot disclosedEnvironment & Energy sales are ¥1,178.8 billion; no RFB breakdown
The one thing to grasp first

Because the tank size sets how long it can discharge, the redox flow battery suits long-duration storage, from several hours to more than ten. The company lists as its features that the electrolyte is non-flammable and is not a hazardous material under Japan's Fire Service Act, that charge and discharge cycles do not accelerate degradation, and that the electrolyte can be reused Sourced. But the development history has not been smooth. Sumitomo Electric began development in 1982 and started delivering to universities and factories in 2001, but breakdowns followed, and in 2005 management decided to withdraw. It revived the business in 2009, and after large demonstrations with Hokkaido Electric Power and in the United States, began operating in 2022 what the company describes as the world's largest-scale facility. The company itself says that its biggest challenge is "achieving a price customers are satisfied with". So this is the story of a company that has polished the technology for a long time, while the profitability of the business depends on lowering price and cost.

2. The logo and how the name is written

A note on names: the legal entity is Sumitomo Electric Industries, Ltd. (called Sumitomo Denko in Japan). Group companies such as Nissin Electric, Sumitomo Densetsu (all of whose shares the company sold in March 2026), Sumitomo Wiring Systems and Sumitomo Riko are separate legal entities. V40 series is the model name of the new redox flow battery, not a legal entity. Vecco Group is an Australian electrolyte maker and John Cockerill a Belgian customer; neither is a Sumitomo Electric subsidiary. This profile covers the redox flow battery only; it does not cover power cables, automotive wiring harnesses, optical fibre or other businesses, nor the home storage battery "POWER DEPO". The logo image was taken from Sumitomo Electric's official website.

Official site: https://sumitomoelectric.com/

3. Where the company sits in the field

This series sorts companies in next-generation energy storage into four types: cells & materials, long-duration & new chemistries, storage systems & operators, and recycling. Sumitomo Electric's redox flow battery uses a chemistry different from lithium-ion (vanadium electrolyte), and its feature is long-duration storage of several hours to more than ten, so it falls under long-duration & new chemistries. Because it also delivers the containers, installs and maintains the storage site and offers operating software (sEMSA), it has a secondary side as storage systems.

Four types of company in next-generation energy storage All are "battery companies", yet strengths and customers differ by type Cells & materials Long-duration & new Storage systems Recycling Builds cells and materials Long hours, new chemistries Cells packed for the grid Used cells to materials CATL / LGES Panasonic / Sila Form Energy / Eos ESS / NGK Insulators Tesla / Fluence and others Redwood Materials and others Scale, materials know-how Cheap inputs, long life Design, operating record Collection and purity Price and capex cycles Few units built so far Cell prices, project flow Feedstock price, volumes Long-duration & new (primary) and storage systems (secondary): redox flow batteries only It builds the battery through to the storage site; battery-only sales are not disclosed
Fig. 1 Four types of company in next-generation energy storage, and where Sumitomo Electric sits. The classification is ours, and the company names are examples from companies covered in this series Our calculation. The classification is ours, based on the company's product pages, Securities Report and Integrated Report.

4. Scale (kept brief, limited to the redox flow battery)

Sumitomo Electric is a diversified manufacturer with five business segments, starting from wire and cable. The redox flow battery belongs to the "Environment & Energy" business. Only the group totals and the figures for that business are shown here Sourced.

Indicator (¥ million)Year to March 2025Year to March 2026
Net sales (consolidated)4,679,7895,110,171
Ordinary profit (consolidated)309,496431,274
R&D expenses (whole group)n/a162,858
Capital expenditure (whole group)n/a243,183
Consolidated employees288,145302,972

The "Environment & Energy" business

¥ millionYear to March 2025Year to March 2026
Net sales1,081,3441,178,780
Operating profit78,718 Our calculation90,615
R&D expensesn/a19,292
Capital expendituren/a51,639
Employees (consolidated, excluding temporary)n/a12,336

The operating profit for the year to March 2025 is our calculation: the ¥90,615 million for the year to March 2026 less the ¥11,897 million increase stated in the Securities Report. The company attributes the sales rise of this business to power cables, rectangular winding wire for electric-vehicle motors, Nissin Electric's switchgear and Sumitomo Densetsu's electrical work, and does not cite a contribution from redox flow batteries. Orders for construction and plants were ¥494,621 million (backlog ¥447,060 million).

A caution

Environment & Energy is mostly power cables, transmission and distribution equipment and winding wire, and sales, profit, orders and headcount for redox flow batteries alone are not disclosed in the materials we reviewed. The Integrated Report's sales by main product also has no entry for redox flow batteries Not yet confirmed. The Securities Report's R&D section says only, in one sentence, that it is "carrying out demonstration operation of a large-scale system" of redox flow batteries.

5. Resources committed to next-generation energy storage

Most headcount and money figures are not disclosed for the redox flow battery alone. What we could confirm, and what we could not, is set out below.

Type of resourceWhat primary sources confirmCategory
PeopleThe redox flow battery is handled by units including the Energy Systems Business Development Division (RFB development and RFB engineering departments) and the electrolyte development group of the Power Systems R&D Center (as named in the company magazine). RFB headcount is not disclosed. The Environment & Energy business has 12,336 employees (consolidated)Sourced / not disclosed
Money (R&D)Group R&D expenses were ¥162,858 million and those of the Environment & Energy business ¥19,292 million (superconductors, power cables, storage batteries and others combined). The RFB share is not disclosedSourced / not disclosed
Money (capital expenditure)Capital expenditure of the Environment & Energy business was ¥51,639 million (mainly capacity increases and rationalization of transmission and distribution wire, cable and switchgear). Capital expenditure dedicated to RFB could not be found. The third Hokkaido Electric Power Network project, decided in April 2026, is a comprehensive contract covering 20 years of maintenance, operation and removal to 2049Sourced / not found
Investment, M&A, joint ventures, divestmentFor the Boggabri mine, electrolyte made by Vecco Group (Australia), 51% held by an affiliate of Idemitsu's Australian subsidiary, is to be used. Joint R&D with Kansai Electric Power since the 1980s. In August 2025 it delivered to a university facility in tie-up with Kansai Electric's control system. No RFB-related investment, acquisition or sale of the business was foundSourced / not found
Public funding and research institutionsNEDO's demonstration in California (fiscal 2015 to 2021, about ¥3.0 billion according to the person in charge). METI's emergency large-scale storage demonstration (fiscal 2013 to 2018, Hokkaido Electric Power; 15,000 kW, 60,000 kWh). On the customer side, METI grid-battery subsidies selected one project in 2025 (Shin-Idemitsu) and three in February 2026. Ministry of the Environment subsidy projects (Ama town in the Oki Islands, Minamikyushu city)Sourced

Status of main projects

ProjectLocationScale (company's stated values)StageDates and notes
Hokkaido Electric Power Network, Minami-Hayakita Substation (grid-side battery)Abira, Hokkaido17,000 kW, 51,000 kWhOperatingCompleted 31 March 2022, operation from April. Operating period 21 years. Used for compensating wind power fluctuation and more. The company calls it the world's largest-scale RFB facility
Same site, emergency large-scale storage demonstrationSame15,000 kW, 60,000 kWhOperatingBegan December 2015. The demonstration ended in fiscal 2018 and operation has continued since
Same, third projectSame11,000 kW x 3 hours (33,000 kWh)Selected (April 2026). Not yet confirmedAims for completion at the end of May 2029. Selected in the tender for grid-side storage needed to connect 97,000 kW of wind generation
San Diego Gas & Electric (US)California2 MW, 8 MWh (March 2017); 500 kW, 4 MWh (September 2024)OperatingA NEDO project. Entered the wholesale electricity market (December 2018) and ran a microgrid on a live distribution network, a first for Japan and the US (December 2021)
Kashiwazaki city (Niigata)Kashiwazaki, Niigata1,000 kW x 8 hours (8,000 kWh), four phasesTwo completed; phases 3 and 4 in constructionPhase 1 September 2024, phase 2 March 2025, phase 3 planned for spring 2026, phase 4 started construction in July 2026 and is planned for spring 2027, bringing total capacity to 32,000 kWh. Completion of phase 3 could not be confirmed
Shin-Idemitsu, Nagasu storage stationTamana, Kumamoto2,000 kW x 4 hours (8,000 kWh)Under constructionStarted March 2025; completion planned for October 2026. The first RFB selected for METI's grid-battery subsidy
Three projects selected for METI's subsidyNamie (Fukushima), Taishi (Hyogo), Kurayoshi (Tottori)2 MW x 6 h, 2 MW x 4 h, 2 MW x 3 h (26 MWh in total)Selected (February 2026). Not yet confirmedThe company says the V40's long life, safety and wide-area certification were valued
Boggabri coal mine (Australia)Queensland2 MW x 6.3 hours (12.6 MWh)Agreement to supply (November 2025)To be combined with solar power installed by Idemitsu Australia
Ama town (Oki Islands)Ama, ShimaneFinal scale 4,000 kW, 12,500 kWhConstruction begun (January 2025)Ministry of the Environment subsidy for remote islands; a joint effort by Chugoku Electric Power Transmission & Distribution, Ama town and Koko (a local company; name transliterated)
Other deliveriesTaiwan (ITRI), Australia (Energy Queensland), Belgium (John Cockerill), Minamikyushu (Kagoshima), Tsuruga (Fukui)1 MW, 3 MWh (Taiwan, Nov 2024); 250 kW, 750 kWh (Australia, Sep 2024); 500 kW, 1,700 kWh (Belgium, Oct 2018); 250 kW, 1,125 kWh (Minamikyushu, Apr 2025); 250 kW, 750 kWh (Tsuruga, Jan 2023)OperatingMinamikyushu was the first RFB under a Ministry of the Environment subsidy. The official case page writes its capacity in "MWh"; we used 1,125 kWh (250 kW x 4.5 hours) from the press release
A materials engineer's view: a battery whose power and capacity are designed separately

The company explains the design freedom of this battery as power set by the number of cell stacks, and discharge time (capacity) set by the volume of electrolyte Sourced. In a lithium-ion battery the electrode materials decide both power and capacity; in a redox flow battery "where electricity is made" (the cell stack) and "where energy is stored" (the electrolyte tanks) are separate. So to double discharge time at the same power, it is enough to enlarge the electrolyte tanks, as the company explains it. On the other hand, the materials of electrode, membrane and electrolyte each affect power and energy density (energy storable per cubic metre of electrolyte). For the new V40 the company says energy density is up 15% (through a newly developed membrane and separate state-of-charge management of the positive and negative sides) and cost is down 30% (through higher cell-stack output and others), both against the third generation (test conditions are not published).

6. What it has done so far

WhenWhat happenedWhy it matters
1982The redox flow battery is adopted as a development theme for power storage; a new recruit is picked to lead it (company magazine). Joint R&D with Kansai Electric Power also beginsA new theme to move away from dependence on power cables. The company says it had no battery experience
1989A 60 kW-class cell with iron-chromium electrolyte is built, but capacity fell because of hydrogen generation and performance could not be kept over timeJudged hard to commercialize then. The company says it later switched to vanadium electrolyte, improving electromotive force, power and energy density
2001Begins delivering redox flow batteries to universities and factoriesThe company says durability was low and failures such as electrolyte leaks followed
2005Management decides to withdraw from the redox flow batteryThe company says troubleshooting became the main work after withdrawal
2009The business is revived and full R&D resumesThe company says the background was demand for large-capacity batteries to store renewable energy, such as under the US Green New Deal
2012 to 2018A 1,000 kW-class test system at the Yokohama Works (2012). Large-scale demonstration with Hokkaido Electric Power (from fiscal 2015). NEDO's California demonstration begins in fiscal 2015Operating technology and reliability were confirmed. The person in charge says the California project cost about ¥3.0 billion over more than seven years
2020 to 2022Wins the tender for Hokkaido Electric Power Network's grid-side battery, starts construction in July 2020 and completes on 31 March 2022. In December 2021, runs a microgrid on a live distribution network in California, a first for Japan and the USThe person in charge says cost was the biggest issue in the tender
2024 to 2025Deliveries to the US, Taiwan, Australia and more. January 2025: Oki Islands. March 2025: Shin-Idemitsu (the first RFB selected for a subsidy). April 2025: Minamikyushu completed. July 2025: third consecutive year of orders from KashiwazakiThe number of sites at home and abroad grew
September 2025Unveils the new V40 series: up to 30 years of operation, about 30% more output than before. Announces orders to start from January 2026Extends the operating period from the earlier 20 years
February to September 2026Three projects selected for METI's subsidy (February). Orders for V40 begin, with 26 MWh selected under the subsidy (March). Third adoption by Hokkaido Electric Power Network (April). Kashiwazaki phase 4 construction starts (July). A 2 MW system is added (September)Larger projects are increasing around the V40

7. What comes next

HOKKAIDO ELECTRIC POWER NETWORK, THIRD PROJECT33,000 kWh
aims for completion end of May 2029
A comprehensive contract covering 20 years of maintenance, operation and removal to 2049
SHIN-IDEMITSU NAGASU STORAGE STATION8,000 kWh
completion planned October 2026
Started March 2025. Selected for a subsidy
KASHIWAZAKI PHASES 3 AND 48,000 kWh each
spring 2026 and spring 2027
Phase 4 brings total capacity to 32,000 kWh
V40 SERIES, 2 MW SYSTEMS8, 12 and 16 MWh (4, 6, 8 hours)The company says duration can be extended beyond 10 hours

These items are the company's plans and schedules, not completed results Not yet confirmed. In its Integrated Report the company lists "winning large redox flow battery projects" among its policies for the Environment & Energy business Sourced. In September 2026 it also began selling the energy management system "sEMSA-ESS", which can manage up to 100 grid-storage sites centrally (we did not check its link to RFB). Further, the company magazine says it is working on a cheaper electrolyte to replace vanadium for the next generation (the stage and timing of that development could not be confirmed).

What we could not confirm

None of the following appears in the primary sources we reviewed Not yet confirmed.

Sales, order backlog and profit for RFB alone / cumulative installed base (output, capacity, number of projects) / manufacturing sites and capacity (battery, cell stack, electrolyte) / the price of the V40 and its measured performance (energy efficiency, degradation) / the state of development of the new electrolyte / the start and completion dates of the three subsidy projects / new plans abroad. Press-reported figures are not used here.

8. What the company is aiming for in energy storage

This section includes points the company has not stated directly. They are inferences from what the primary sources say, and each is given with its basis.

What can be read from itPrimary-source basisCategory
Its main field is long-duration grid storage (3 to 8 hours or more)The V40 comes as 2 MW x 4, 6 and 8 hours; the three selected projects are 3 to 6 hours, Kashiwazaki is 8 hours and Boggabri 6.3 hours. The company says that the longer the capacity, the better the cost advantageSourced
It puts safety and long life forward, not price, as reasons for selectionIn the Shin-Idemitsu, Minamikyushu, Boggabri and Hokkaido projects, the company cites low fire risk, long life and operating record as the reasons customers chose itSourced (company statement)
It extends the operating period from 20 to 30 years to lower the cost per kW-year and compete in tendersThe company says 30-year operation helps hold down bid prices (yen per kW per year) in the long-term decarbonization power source auctionSourced
The way of selling is widening from "selling a battery" to contracts that include long-term maintenance and operationThe third Hokkaido Electric Power Network project is a comprehensive contract including maintenance, operation and removal to 2049; the operating software sEMSA-ESS has also gone on saleInference
It is relying strongly on subsidy programmes to grow projectsOf the main recent domestic projects, the Nagasu project and the three of February 2026 were selected for METI subsidies. We could not confirm orders without subsidyInference
One inference in more detail: how to read the 2005 withdrawal and 2009 revival

According to the company magazine, the redox flow batteries delivered from 2001 had low durability and kept failing, for example by leaking electrolyte, so management decided to withdraw in 2005. The development team kept investigating causes afterwards, and the business was revived in 2009. The company explains the revival as the result of a changed environment, with demand for large batteries to store renewable energy, and of the work it had done on the causes of past troubles Sourced. From this we read that today's emphasis on "30-year operation" and on "eliminating leaks entirely" reflects the experience of that failure. Indeed, the magazine names "maintaining the long-term reliability of the cell stack" and "eliminating electrolyte leaks completely" as the main themes after the revival. But 30 years is stated as "the longest, with appropriate maintenance and inspection", not as a record of operation for 30 years Not yet confirmed (the new V40 has only just begun operating, so measured life cannot be confirmed).

9. Map of partnerships in next-generation energy storage

Relationships around Sumitomo Electric's redox flow battery Only ties stated in the company's releases, pages and magazine; press-reported ties are excluded Sumitomo RF battery Hokkaido Electric Power Network Demo, then 3 adoptions (2015 on) NEDO and SDG&E (US) California demonstration Kashiwazaki, Shin-Idemitsu Domestic storage-site owners Idemitsu Australia, Vecco Mine project, electrolyte supply METI and Ministry of the Environment Joint work or demonstration Customer or supplier Subsidy providers (dotted)
Fig. 2 Relationships around Sumitomo Electric's redox flow battery. Sources: the company's releases, RFB pages and company magazine "id" Vol. 19. The figure includes only relationships stated in official materials, and leaves out deals that the press has mentioned. METI and the Ministry of the Environment appear mainly as customer-side subsidy programmes, so Sumitomo Electric did not necessarily receive the subsidy itself (apart from the NEDO demonstration). Vecco Group is an electrolyte maker in which an affiliate of Idemitsu's Australian subsidiary holds 51%.

10. Technologies, products and services

As the company describes it, the redox flow battery works as follows Sourced. It charges and discharges using the oxidation and reduction of ions such as vanadium, holding the positive and negative electrolytes in tanks and circulating them to the cells by pump. The reaction involves only changes in the valence of vanadium ions in the electrolyte, with no dissolution or deposition of electrodes, so the company says electrodes and electrolyte hardly degrade.

Product or itemWhat official materials sayNote
V40 series (new model)2 MW systems with capacity of 8 MWh (4 hours), 12 MWh (6 hours) and 16 MWh (8 hours). Modules are 334 kW (30-foot or 40-foot tank) or 250 kW (40-foot). A container design that the company says cuts transport and installation costs and footprint. JC-STAR 1-star cybersecurity certification obtained. A 1 MW system is also offeredValues are manufacturer's stated. Duration can be extended beyond 10 hours, the company says
V40 improvements (against the third generation)Energy density up 15% (new membrane, separate state-of-charge management of the two sides). Cost down 30% (higher cell-stack output, less electrolyte, better manufacturing). Battery output up about 30% on the earlier model. Operating period up to 30 years (20 years for the earlier model)Conditions and test methods of comparison are not published. The company's explanation, not measured values
SafetyThe vanadium sulfate electrolyte is non-flammable and other materials are flame-retardant. UL1973 certification (North American safety standard) obtained. Not a hazardous material under the Fire Service Act, so no hazardous-materials installation permit or resident handler is needed. For the Boggabri mine, the company says the absence of ignitable materials and of thermal-runaway concern was valuedThis article does not rank it against other batteries
Environment and recyclingElectrolyte is reusable (with a record). Equipment materials can be recycled at 99% with proper sorting (wide-area certification from the Ministry of the Environment). Industrial waste at removal below 1% (Oki Islands release, January 2025)The number of reuse cases and their conditions could not be confirmed
Approach to costThe longer the capacity, the lower the cost per capacity. No cell or electrolyte replacement and no special fire-fighting equipment needed. The company names its greatest challenge as "achieving a price customers are satisfied with"Price is not published
Operation and managementThe energy management system "sEMSA". In September 2026 it began selling "sEMSA-ESS", which manages up to 100 grid-storage sites centrallyUse together with RFB was confirmed in the Minamikyushu project. The third Hokkaido project is a comprehensive contract including maintenance, operation and removal
A materials engineer's view: where electrode, membrane and electrolyte decide performance and price

The company says the key to cost reduction is higher cell-stack output, pursued through improved electrode and membrane materials and a cell structure that lowers pressure loss when circulating the electrolyte Sourced. It also says that the design of cell-stack materials and structure goes hand in hand with the properties of the electrolyte. And it says that the vanadium in today's electrolyte is expensive, with price-swing risk and uneven distribution of the resource, and that it is working toward a cheaper, more stably available raw material that could match vanadium in performance.

As a general point, in a redox flow battery the vanadium in the electrolyte is thought to account for a large part of the cost, so the price of the electrolyte and the output of the cell stack (how much power can be drawn from the same electrolyte) greatly affect system price (this is our own general explanation and not a breakdown the company has published). In fact the company does not disclose the cost or price breakdown of the electrolyte Not yet confirmed. Nor could we confirm the specific membrane and electrode materials from official materials. This article makes no comparison with other makers' batteries.

11. The risks this company carries

RiskWhat it involvesCategory
Price and costThe company itself says its biggest challenge is "achieving a price customers are satisfied with", and the person in charge says cost was the biggest issue in the Hokkaido Electric Power Network tender. It also says the vanadium in the electrolyte is expensive, with price swings and an uneven distribution of the resourceSourced
Past withdrawal and reliabilityAfter delivery from 2001, electrolyte leaks and other failures followed, and management decided to withdraw in 2005. Long-term reliability is now a focus, but the new V40's 30 years is a "longest" figure "with appropriate maintenance", not a record of operationSourced
Dependence on subsidy programmesSome of the main recent domestic projects were selected for METI or Ministry of the Environment subsidies. This article has not checked the content or continuation of those programmes against government sources. We could not confirm orders if the subsidies shrankInference
Responsibility for long-term maintenance and operationA comprehensive contract covering 20 years of maintenance, operation and removal, as in the third Hokkaido Electric Power Network project, needs cost estimates based on long operating experience. We did not find provisions or losses relating to RFB in the materials we reviewedNot yet confirmed
Ramp-up of the new modelThe V40 only began taking orders in 2026, and completion and operation of the selected projects are still to come. Measured energy efficiency and degradation could not be confirmedSourced / not found
Parts that cannot be checked from outsideRFB-only sales, profit, order backlog, production capacity, cumulative installed base and price are not disclosed, so the profitability of the business cannot be checked from outsideNot yet confirmed
Competition from other methodsIn long-duration storage there is competition from other methods. This article has not been able to confirm, from primary sources, comparisons with other makers' products or market shareNot yet confirmed

12. Glossary

Redox flow battery (RFB)
A storage battery that holds electrolyte containing active material (such as vanadium) in tanks and circulates it through cells by pump to charge and discharge.
Cell stack
Single cells with electrodes and membranes stacked together, where charging and discharging actually take place. Power is set by the number of cell stacks.
Electrolyte
The liquid containing active material. Here it is an aqueous solution of vanadium sulfate, and the tank volume sets the discharge time.
Grid-side battery
A large battery that a transmission and distribution operator places on the grid side, not at a power plant, to absorb renewable output swings collectively.
Long-term decarbonization power source auction
A tender run by OCCTO, Japan's grid coordination body, to encourage new investment in decarbonized power sources.
UL1973
One safety standard for stationary batteries. Sumitomo Electric says it has obtained certification.
JC-STAR
A scheme published by METI for assessing the security conformity of IoT products. One star is level 1.
Wide-area certification
A scheme in which a manufacturer, certified by the Minister of the Environment, collects its own products' waste over a wide area for recycling or proper treatment.
NEDO
New Energy and Industrial Technology Development Organization, a Japanese public agency that supports R&D and demonstration projects.
Securities Report
The annual report that listed companies in Japan file under the Financial Instruments and Exchange Act.
Fig
Fig. 3 A concept image of a redox flow battery storage station (AI-generated concept; it is not a photograph of actual equipment or products). Reading guide: Electrolyte tanks, reaction stacks and power-conversion equipment serve different roles.

13. References

  1. Sumitomo Electric Industries 156th Securities Report (1 April 2025 to 31 March 2026, filed 26 June 2026), in Japanese. History, segment results and employees, R&D, capital expenditure. https://sumitomoelectric.com/jp/sites/japan/files/2026-06/download_documents/yuuka156.pdf
  2. Sumitomo Electric Industries Integrated Report 2026, in Japanese. Company overview, Environment & Energy strategy, timeline (start of commercial operation of a world-largest-class RFB facility), sales by main product. https://sumitomoelectric.com/jp/sites/japan/files/2026-10/download_documents/integratedreport2026.pdf
  3. Sumitomo Electric Industries Redox flow battery (product information), in Japanese. How it works, topics. https://sumitomoelectric.com/jp/products/redox
  4. Sumitomo Electric Industries Redox flow battery features (product information), in Japanese. Safety, environment, life, design freedom. https://sumitomoelectric.com/jp/products/redox/features
  5. Sumitomo Electric Industries Redox flow battery case studies (product information), in Japanese. Installations in Japan, the US, Europe, Australia and Asia. https://sumitomoelectric.com/jp/products/redox/cases
  6. Sumitomo Electric Industries Redox flow battery lineup (product information), in Japanese. V40 series specifications. https://sumitomoelectric.com/jp/products/redox/ranges
  7. Sumitomo Electric Industries Redox flow battery catalogue (September 2026 edition), in Japanese and English. Principle, features and specifications of the V40, comparison with the third generation. https://sumitomoelectric.com/jp/sites/japan/files/2026-09/download_documents/RFB_Catalog202609_JP.pdf
  8. Sumitomo Electric Industries New redox flow battery V40 series enabling up to 30 years of operation (11 September 2025), in Japanese. https://sumitomoelectric.com/jp/press/2025/09/prs118
  9. Sumitomo Electric Industries Three redox flow battery projects selected for METI's grid-battery subsidy (10 February 2026), in Japanese. https://sumitomoelectric.com/jp/press/2026/02/prs015
  10. Sumitomo Electric Industries New domestically made redox flow battery for 30 years of operation, three METI subsidy selections (16 March 2026), in Japanese. https://sumitomoelectric.com/jp/press/2026/03/prs025
  11. Sumitomo Electric Industries Third redox flow battery adopted at Hokkaido Electric Power Network's Minami-Hayakita Substation (21 April 2026), in Japanese. https://sumitomoelectric.com/jp/press/2026/04/prs040
  12. Sumitomo Electric Industries Construction of the fourth phase of the redox flow battery starts in Kashiwazaki, Niigata (8 July 2026), in Japanese. https://sumitomoelectric.com/jp/press/2026/07/prs078
  13. Sumitomo Electric Industries A 2 MW redox flow system added (7 September 2026), in Japanese. https://sumitomoelectric.com/jp/press/2026/09/prs100
  14. Sumitomo Electric Industries Redox flow battery to contribute to GX at an Australian coal mine (11 November 2025), in Japanese. https://sumitomoelectric.com/jp/press/2025/11/prs153
  15. Sumitomo Electric Industries Third consecutive year of orders for long-duration redox flow batteries from Kashiwazaki, Niigata (July 2025), in Japanese. https://sumitomoelectric.com/jp/press/2025/07/prs094
  16. Sumitomo Electric Industries Redox flow battery adopted for Shin-Idemitsu's grid battery (March 2025), in Japanese. https://sumitomoelectric.com/jp/press/2025/03/prs030
  17. Sumitomo Electric Industries First completion of a redox flow battery in a Kyushu regional microgrid (April 2025), in Japanese. https://sumitomoelectric.com/jp/press/2025/04/prs055
  18. Sumitomo Electric Industries Start of building a redox flow battery system in the Oki Islands (January 2025), in Japanese. https://sumitomoelectric.com/jp/press/2025/01/prs005
  19. Sumitomo Electric Industries Redox flow battery contributes to AI-based optimization of renewables at Osaka Metropolitan University (August 2025), in Japanese. https://sumitomoelectric.com/jp/press/2025/08/prs101
  20. Sumitomo Electric Group magazine "id" Vol. 19, chapter 3: "The long-held wish for a storage battery over 40 years", in Japanese. https://sumitomoelectric.com/jp/id/project/v19/03
  21. Sumitomo Electric Group magazine "id" Vol. 19, chapter 4: "Grid-side battery for stable power supply: Hokkaido Electric Power Network, Minami-Hayakita Substation", in Japanese. https://sumitomoelectric.com/jp/id/project/v19/04
  22. Sumitomo Electric Group magazine "id" Vol. 19, chapter 5: "Entering the wholesale electricity market and microgrid demonstration: NEDO project in California", in Japanese. https://sumitomoelectric.com/jp/id/project/v19/05
  23. Sumitomo Electric Industries Official website (source of the logo), in Japanese. https://sumitomoelectric.com/jp/

14. Claim-to-source audit

Claim in the articleCategorySource
Legal name, head office, founding in 1897 and incorporation in 1920, consolidated net sales (¥4,679,789 million to ¥5,110,171 million), ordinary profit, 302,972 employees, R&D of ¥162,858 million and capex of ¥243,183 millionSourcedReference 1 https://sumitomoelectric.com/jp/sites/japan/files/2026-06/download_documents/yuuka156.pdf
Environment & Energy sales of ¥1,178,780 million, operating profit of ¥90,615 million (increase of ¥11,897 million), orders of ¥494,621 million and backlog of ¥447,060 million, R&D of ¥19,292 million, capex of ¥51,639 million, 12,336 employees, and the one-sentence mention of RFB demonstration operationSourcedReference 1 https://sumitomoelectric.com/jp/sites/japan/files/2026-06/download_documents/yuuka156.pdf
Securities code 5802, listing venues, the start of commercial operation of a world-largest-class RFB facility (2022), RFB as a product of Environment & Energy, "winning large projects" as a policy, and no RFB entry in sales by main productSourcedReference 2 https://sumitomoelectric.com/jp/sites/japan/files/2026-10/download_documents/integratedreport2026.pdf
How the RFB works, topics (September 2026)SourcedReference 3 https://sumitomoelectric.com/jp/products/redox
RFB features (non-flammable, UL1973, 20-year system durability, design freedom)SourcedReference 4 https://sumitomoelectric.com/jp/products/redox/features
Case studies (Hokkaido Electric Power Network, SDG&E, ITRI, Energy Queensland, John Cockerill, Minamikyushu, Kashiwazaki, Nippon PS) with scale and datesSourcedReference 5 https://sumitomoelectric.com/jp/products/redox/cases
V40 series specifications (8, 12 and 16 MWh; module configuration; JC-STAR 1 star; duration extendable)SourcedReference 6 and 7 https://sumitomoelectric.com/jp/products/redox/ranges https://sumitomoelectric.com/jp/sites/japan/files/2026-09/download_documents/RFB_Catalog202609_JP.pdf
V40 energy density +15% and cost -30% (against the third generation), 30-year operation, recycling of electrolyte and parts, wide-area certificationSourcedReference 7 https://sumitomoelectric.com/jp/sites/japan/files/2026-09/download_documents/RFB_Catalog202609_JP.pdf
V40 unveiled (September 2025), up to 30 years against 20 years before, about 30% more output, orders planned from January 2026SourcedReference 8 https://sumitomoelectric.com/jp/press/2025/09/prs118
Three projects selected for METI's subsidy (February 2026: RS Technologies; Sumitomo Mitsui Finance & Leasing with Miki Kogyo; RYODEN with Japan Energy Total System)SourcedReference 9 https://sumitomoelectric.com/jp/press/2026/02/prs015
Orders for the V40 begin, 26 MWh across three projects selected under the subsidy (March 2026)SourcedReference 10 https://sumitomoelectric.com/jp/press/2026/03/prs025
Third Hokkaido Electric Power Network project (33,000 kWh, completion target end of May 2029, contract to 2049) and past deliveries (15,000 kW/60,000 kWh; 17,000 kW/51,000 kWh)SourcedReference 11 https://sumitomoelectric.com/jp/press/2026/04/prs040
Kashiwazaki phase 4 construction start (July 2026), total capacity of 32,000 kWh, spring 2027 targetSourcedReference 12 https://sumitomoelectric.com/jp/press/2026/07/prs078
The 2 MW system added (September 2026), adoption in the long-term decarbonization power source auction and subsidy projectsSourcedReference 13 https://sumitomoelectric.com/jp/press/2026/09/prs100
Supply to the Boggabri mine (2 MW x 6.3 hours), Vecco Group electrolyte, absence of ignitable materials valuedSourcedReference 14 https://sumitomoelectric.com/jp/press/2025/11/prs153
Kashiwazaki phases 1 and 2 completed, phase 3 planned for spring 2026SourcedReference 15 https://sumitomoelectric.com/jp/press/2025/07/prs094
Shin-Idemitsu Nagasu storage station (2,000 kW x 4 hours, completion planned October 2026, the first RFB selected for the subsidy)SourcedReference 16 https://sumitomoelectric.com/jp/press/2025/03/prs030
Minamikyushu project (250 kW x 4.5 hours, 1,125 kWh, the first RFB under a Ministry of the Environment subsidy)SourcedReference 17 https://sumitomoelectric.com/jp/press/2025/04/prs055
Ama town in the Oki Islands (final scale 4,000 kW and 12,500 kWh, Ministry of the Environment subsidy, industrial waste at removal below 1%)SourcedReference 18 https://sumitomoelectric.com/jp/press/2025/01/prs005
Delivery to Osaka Metropolitan University and the demonstration in tie-up with Kansai Electric's control systemSourcedReference 19 https://sumitomoelectric.com/jp/press/2025/08/prs101
Development began in 1982, joint R&D with Kansai Electric Power, the 1989 prototype, switch to vanadium, delivery from 2001, the 2005 withdrawal decision, the 2009 revival, the 2012 1,000 kW-class test system, price as the challenge, and the electrolyte development policySourcedReference 20 https://sumitomoelectric.com/jp/id/project/v19/03
The Hokkaido Electric Power Network tender (2019 call, July 2020 start of construction, 31 March 2022 completion) and 17,000 kW x 3 hoursSourcedReference 21 https://sumitomoelectric.com/jp/id/project/v19/04
NEDO's California demonstration (about ¥3.0 billion, over 7 years), entry into the wholesale market, and microgrid operation (2021)SourcedReference 22 https://sumitomoelectric.com/jp/id/project/v19/05
RFB-only sales, profit, order backlog, production capacity, cumulative installed base and price, measured performance of the V40, state of the new electrolyte, and subsidy amountsNot yet confirmedReferences 1, 2, 3, 7 https://sumitomoelectric.com/jp/sites/japan/files/2026-06/download_documents/yuuka156.pdf https://sumitomoelectric.com/jp/sites/japan/files/2026-10/download_documents/integratedreport2026.pdf https://sumitomoelectric.com/jp/products/redox https://sumitomoelectric.com/jp/sites/japan/files/2026-09/download_documents/RFB_Catalog202609_JP.pdf
The four-type classification and Sumitomo Electric's position (primary: long-duration & new chemistries, secondary: storage systems)Our calculationOur own classification; company names are examples from those covered in this series
Environment & Energy operating profit of ¥78,718 million for the year to March 2025Our calculationOur own calculation: ¥90,615 million less the ¥11,897 million increase
Longer operating period (30 years) aimed at lowering bid pricesSourcedReferences 8 and 10 https://sumitomoelectric.com/jp/press/2025/09/prs118 https://sumitomoelectric.com/jp/press/2026/03/prs025
The reading that selling is widening to contracts including long-term maintenance and operationInferenceOur own reading of the third Hokkaido contract and the sale of operating software
The reading that it is relying strongly on subsidy programmesInferenceOur own reading of the number of selected projects; the programmes themselves have not been checked against government sources
The reading that the present "30 years" emphasis reflects the experience of past failureInferenceOur own reading of the magazine's account of the main theme after the revival
That vanadium is thought to be a large part of the cost, and that electrolyte price and cell-stack output affect system price (general points)Our calculationThis is our own general commentary and not a breakdown published by Sumitomo Electric
Content and stage of subsidies and regulationsNot yet confirmedThis article has not checked these against government or regulatory sources and keeps to the company's own statements

Last updated 10 October 2026 / Troy Technical
Figures in this article come from Sumitomo Electric's Securities Report, Integrated Report, official product pages and catalogue, official releases and company magazine. No research-firm estimates or press-reported figures have been used. Performance values are the company's statements, and values without stated conditions are not measurements. Items marked "Inference" are our reading of the primary sources and are not statements by the company. The company's plans and targets are not yet confirmed and are not results achieved.