MENU

Moment Energy Nova: Repurposed EV BESS Specs and UL Certification

EVXL USA
Overview
Moment Energy has introduced Nova, a commercial battery energy storage system (BESS) built from repurposed electric vehicle battery packs. It is the first such system to achieve UL 1973 and UL 9540 certifications, with first deliveries scheduled for Q1 2027.
In Depth

Key Findings

Moment Energy has launched Nova, a commercial-grade BESS utilizing repurposed EV batteries. The system is the first of its kind to be certified to UL 1973 and UL 9540, meeting the electrical code listing requirements for stationary storage in the United States and Canada. Additionally, the system has been tested to UL 9540A for thermal runaway fire propagation, and the company’s Megafactory 1 is certified to UL 1974 for the sorting and grading of EV batteries.

Technical Details

The Nova platform is designed for scalability and flexibility, integrating batteries from various EV types. Key technical specifications include:

  • Capacity: Each Nova block provides 500 kWh of energy and 200 kW of power.
  • Footprint: Each block occupies a space of 2.94 m by 1.80 m (9.65 ft x 5.9 ft).
  • Management: A proprietary AI-powered battery management system (BMS) optimizes batteries across different states of health.
  • Architecture: A swappable design allows individual battery packs to be replaced as they age without disturbing the enclosure or concrete pad, extending the system’s lifespan to over 20 years via capacity augmentation services.

Background and Context

Nova is manufactured in North America and is independently verified as compliant with Foreign Entity of Concern (FEOC) requirements. Moment Energy is also verified as a non-Prohibited Foreign Entity. These certifications make Nova the only third-party verified BESS eligible for the U.S. federal Investment Tax Credit (ITC) from 2027 onwards. The system is intended to reduce reliance on battery imports from China by establishing a domestic supply chain using retiring EV batteries.

Significance and Outlook

The system targets commercial, industrial, and large-scale applications, including hospitals, airports, and manufacturing sites. By repurposing EV batteries, the platform aims to prevent batteries from entering landfills and unlock residual value within a circular economy. First deliveries are planned for the first quarter of 2027.

Source: https://evxl.co/2026/11/17/moment-energy-nova-storage-used-ev-packs/

Get our weekly technology intelligence — free

Receive an infographic that lets you judge at a glance whether each field’s analysis report is worth reading.

Subscribe Free — Weekly Tech Intelligence

By subscribing, you’ll receive Troy-Technical’s weekly technology intelligence newsletter.

  • Your email and selected fields are used only to deliver the newsletter.
  • We never share your information with third parties.
  • You can unsubscribe anytime via the link in each email.

See our Privacy Policy for details.

Takes about a minute · Unsubscribe anytime

Published by Troy-Technical, an independent site run by one engineer with a career in materials development.
About the author / Contact info@troy-technical.jp
Let's share this post !

Author of this article

TOC